Primary offer

$1,000 Sales Follow-Up Control Plane Sprint

A paid sprint for one painful workflow. We convert the pain into a specification, map failure points, design the governed workflow, and deliver a prototype path with evidence and controls.

Best-fit problems

  • Sales leads are being lost after inquiry.
  • Client follow-up is inconsistent or invisible.
  • Manual reporting consumes operator time.
  • AI outputs exist but lack approval gates.
  • Teams need proof, not another automation demo.

Sprint package

$1,000 Fixed-Scope Sprint

Fixed scope: one workflow, one failure map, one governed prototype, and one verified outcome specification.

The $1,000 sprint is fixed-scope. If the workflow requires deeper implementation, custom integrations, CRM rebuilds, or ongoing operation, those are quoted separately after the sprint.

Sprint deliverables

Day 1
PAIN

Pain intake + current-state workflow

Capture the pain, workflow boundaries, actors, tools, and known failure points.

Day 2
SPECIFICATION

Specification + acceptance criteria

Define what "good" means: target result, tolerance, evidence, and pass/fail method. This is the exact instrument we hand you on Day 2 — open the Outcome Specification template →

Day 3
CONTROL

FMEA + control design

Map failure modes, severity, occurrence, detectability, prevention controls, and escalation paths.

Day 4
CONTROL

Prototype architecture

Design the form, data model, workflow automations, AI assistance layer, and dashboard.

Day 5
CONTROL

Build the first controlled flow

Implement a practical version with logging, owner assignment, and evidence capture.

Day 6
EVIDENCE

Test against scenarios

Run happy path, edge cases, stale-item handling, approval failure, and evidence review.

Day 7
VERIFIED OUTCOME

Outcome review + roadmap

Package findings, prototype evidence, ROI logic, and implementation plan.

What STAGERLABS is — and isn't

STAGERLABS is a governed-AI advisory and build practice. The 7-Day Sprint is a fixed-scope diagnostic-and-prototype engagement — not a software subscription. You leave owning three things: a specification, a working prototype, and an evidence dashboard.

After Day 7, you pick one path:

  • Build — we implement the full workflow against the verified spec (retainer or fixed-bid).
  • Handoff — you take the spec, prototype, and roadmap in-house and build it; we review at milestones.
  • Operate — we run and maintain the control plane as a managed service (monthly).

The Sprint doesn't lock you into any path. Its job is to make that decision evidence-based instead of speculative.

Request review

Submit one workflow for sprint qualification.

Describe the workflow where follow-up, reporting, or accountability is breaking down. We'll review your submission and confirm sprint fit within one business day.

We will evaluate the workflow against pain, specification, control, evidence, and outcome fit.